The Masterplan

It seems every 2-3 weeks I update my plan, but as of today, here's the snapshot of what I'm building.




Dashed rails are in tunnel or under the table.  The double mainline along the right hand side, right up against the wall, is hidden by a ridge line but not actually covered.   The Blue/Yellow track is all built and wired, the purple/green has yet to be constructed.   The numbers in the image show elevation in mm and % grades.